QUESTION 1

Vertical MOS

ANSWER

o 12K (plumber), 12R (interior electrician), 12W (Carpentry/masonry)

QUESTION 2

Construction MOS

ANSWER

o 12G (Quarrying specialist- reserves), 12N (horizontal construction), 12V (concrete/asphalt equipment operator), 12T (technical engineer/surveyor)

QUESTION 3

Prime Power MOS

ANSWER

o 12P (prime power production specialist), 12Q (power line distribution specialist- reserves)

QUESTION 4

Horizontal MOS

ANSWER

o 12N

QUESTION 5

Survey MOS

ANSWER

o 12T (technical engineer/surveyor)

QUESTION 6

Combat MOS

ANSWER

o 12B (combat engineer), 12C (bridge crewmember)

QUESTION 7

12H

ANSWER

Construction Engineering Supervisor; from vertical MOS (12R, 12W, 12K); SSG and above (30 level/squad leader)

QUESTION 8

12X

ANSWER

General Engineering Supervisor; 50 level (MSG/1SG); from horizontal, vertical, survey or power MOS (12N, 12R, 12W, 12K, 12T, 12P, 12Q)

QUESTION 9

120A

ANSWER

Warrant Officer; Construction Engineering Technician

QUESTION 10

12Z

ANSWER

Combat Engineering Senior Sergeant; from 12B or 12C MOS, 50 level (MSG/1SG)

QUESTION 11

12W

ANSWER

Ex. Build a CMU (cinder block) wall; Carpentry/Masonry Specialist

QUESTION 12

12N40

ANSWER

Supervise a horizontal platoon building a road

QUESTION 13

12H40

ANSWER

Supervise a vertical platoon constructing a SEA-hut (southeast Asia hut)

QUESTION 14

12K20

ANSWER

Supervise a team installing toilets; note: Become a 12H at squad leader level (30 level)

QUESTION 15

ESC

ANSWER

Engineer Support Company; Best suited for rapid runway repair; All equipment air mobile; 3 PLT (2 rapidly deployable earthmoving PLT light (RDE-L) and 1 RDE medium)

QUESTION 16

ESC Tasks

ANSWER

Rapid Runway Repair; initial basecamp construction; non-explosive obstacle breaching'; non-explosive area clearing; construct tactical UAV airfields, HLZs, and Assault Landing Zones

QUESTION 17

ECC

ANSWER

Engineer construction company; has 2 horizontal platoons; capable of horizontal and vertical (emphasis horizontal)

QUESTION 18

Vertical Platoon

ANSWER

Smallest unit that has plumbers, carpenters and electricians; Electricians in 3rd squad (power squad); tasks - basic steel, carpentry, CMU, plumbing/electrical

QUESTION 19

249th EN BN

ANSWER

Has most of Army's 12P and 12Q; Prime Power Battalion; All active duty except D Co (12Q - reservists)

QUESTION 20

Prime Power Battalion Tasks

ANSWER

All aspects of electrical power and distribution systems Install provisional distribution systems Provide direct technical expertise for repair and sustainment of electrical systems limited design and analysis capability Provide advice and technical assistance on all aspects of electrical power Provide limited, interim contingency power generation to critical facilities Limited repair and maintenance of industrial electric systems and control; Placing of overhead or ground-laid power lines.

QUESTION 21

BEB

ANSWER

o Armor, Stryker, or Infantry Brigade Engineer Battalions o All variants have some construction assets o BEB's only house 25% of the engineer support a brigade actually needs when it deploys

QUESTION 22

EAB

ANSWER

Echelon Above Brigade; Augments maneuver forces with their companies; Battalion level has construction and management section (CMS) and survey and design section (S & D);

QUESTION 23

EVCC

ANSWER

Engineer Vertical Construction Company; Capable of horizontal and vertical (emphasis vertical)

QUESTION 24

FMT

ANSWER

Field Maintenance Team; 91L - repair construction equipment All construction companies have them Assets: Forward Repair System (FRS) and M984A4 Recovery Truck (Wrecker)

QUESTION 25

Stakeholder Management

ANSWER

Engage early and often

QUESTION 26

6 Steps of Management Process

ANSWER

o Identify all stakeholders o Document stakeholder needs o Assess & analyze stakeholder's interests/ influence o Manage stakeholder's expectations o Take actions o Review status & repeat

QUESTION 27

5 Questions to Identify Stakeholders

ANSWER

• Does the stakeholder have a fundamental impact on your organization's performance? (Required response: yes.) • Can you clearly identify what you want from the stakeholder? (Required response: yes.) • Is the relationship dynamic — that is, do you want it to grow? (Required response: yes.) • Can you exist without or easily replace the stakeholder? (Required response: no.) • Has the stakeholder already been identified through another relationship? (Required response: no.)

QUESTION 28

Project Manager's Role

ANSWER

Manage: expectations, communications, stakeholders

QUESTION 29

Process Groups (5)

ANSWER

Initiating, Planning, Executing, Monitor/control, Closing

QUESTION 30

Managing Expectations - Planning Process Group

ANSWER

• Develop approaches to involve stakeholders based on needs/expectations • How do you reduce negative impacts and manage negative stakeholders? • Stakeholder Matrix: Determine influence and interest of each stakeholder • Plan communications management (transparency and stakeholder buy-in) - build communications plan

QUESTION 31

Building Communications Plans

ANSWER

N(N-1)/2 = number of channels on project; Doesn't change anything with your project; a way to conceptualize your communication plan and the overall scope ex. 4(4-1)/2 = 6

QUESTION 32

Stakeholder Matrix: Ex. High power, but low interest stakeholder

ANSWER

Keep satisfied

QUESTION 33

Types of Communication

ANSWER

• Interactive - 2 (or more) way direct communication; All parties sending/receiving info • Push - to give out information (email, memo); You or someone in team pushing info out • Pull - gather information; Ex sharedrive, intranet

QUESTION 34

Methods of Communication

ANSWER

Informal written/verbal, Formal written/verbal

QUESTION 35

Communication Dimensions

ANSWER

Internal - within organization External Formal Informal Hierarchical focus (How you talk to BC vs peers) Official Unofficial Written and oral

QUESTION 36

Information Exchange

ANSWER

Written, Spoken, Formal/Informal, Gestures, Media, Choice of words

QUESTION 37

Executing - Process Group

ANSWER

Take action and Manage Communications • Communicate/work with stakeholders to meet needs • Address issues • Keep stakeholders engaged/involved

QUESTION 38

Monitoring/Controlling - Process Group

ANSWER

Monitor communications, review status, and repeat throughout duration of project

QUESTION 39

Project (definition)

ANSWER

o Has a defined result/product o Start and end state (temporary) o Resources of money/time o Quality assurance/control, oversight

QUESTION 40

Project Examples

ANSWER

Running a range Constructing an obstacle course Organizing the Battalion Ball Conducting pre-deployment train-up

QUESTION 41

Project Constraints

ANSWER

Time, Money (resources/budget), scope (features/functionality)

QUESTION 42

Project Triangle Model

ANSWER

How Time, Money, and Scope affect quality; Changes in one or more impact the others and/or overall project quality; Ex. If time decreases you might need to increase cost or reduce the scope

QUESTION 43

Army Phasing Model

ANSWER

• Initial project planning • Prelim Construction planning • Detailed project planning • Final planning/project turnover • Project execution/monitoring • Final project transfer/close out (Per TM but seldom used in reality)

QUESTION 44

Roles - CSM

ANSWER

• Mentor those beneath them (1SG) • Provide input to BC on strategic goal alignment

QUESTION 45

Roles - Battalion Commander

ANSWER

• Final authority for risk management (high risk) • Senior Project Manger • Final authorization and guidance prior to execution; authorize extension/increased workhours • Responsible for quality/safety

QUESTION 46

Roles - Battalion XO

ANSWER

• Guides company Os • Receives weekly updates from constructing units

QUESTION 47

Roles - S3 Officer

ANSWER

• Manages and prioritizes projects • Provides guidance to CMS • Directs equipment/personnel between companies as requested

QUESTION 48

Roles - S3 CMS

ANSWER

• Conducts initial planning • Determine feasibility/scope of projects; present to BN CDR • Issues troop construction directives to subordinates • Review GANTT charts, quality control plan, BOM, directives, etc o Final approval of all plans/drawings o Reviews PL's material prior to PCB to the BN CDR • Set up Pre-design conferences (reviews for at least every 1/3 of progress) • Ensure adherence to deadlines and goals • Acquires paperwork needed to complete projects (ex. dig permits) • Quality assurance (inspects projects) • Receives daily/weekly reports

QUESTION 49

CMS Defined

ANSWER

Construction Management Section; Key Roles: Conducts initial planning; Determine feasibility/scope of projects; present to BN CDR; Issues troop construction directives to subordinates

QUESTION 50

Roles - Battalion S & D Section

ANSWER

Survey and Design Section • Initial plans (Make the troop constructive directives, Initial Bill of materials) • As built drawings • Quality assurance throughout project (Materials testing) • Initial, interim and final surveys

QUESTION 51

Roles - Battalion S4

ANSWER

• Order supplies • Manage Battalion Class 4 yard • Special requests • Track all project BOM status, provide updates on delivery schedule changes, ensure within budget

QUESTION 52

Roles - Company Commander

ANSWER

• Develop PLs • Push out BN CDR's intent • Approve low risk safety plans • Ensure compliance with SOP • Ensure safety is a top priority • First line of quality assurance

QUESTION 53

Roles - Company XO

ANSWER

• Maintain records, assist PL's, conduct site recons • Review/submit RFIs and FARs

QUESTION 54

Roles - Company 1SG

ANSWER

• Mentor PSGs (project supervisors) and squad leaders (crew leaders) • Provide input to company commander

QUESTION 55

Roles - PL

ANSWER

• Project manager for your project • Bring issues up to XO • Takes photographs of project's progress • Safety plan, bill of materials, quality control plan, level III Gantt Chart, brief BC in PCB

QUESTION 56

Terms - PCB

ANSWER

Pre-Construction Brief; Final brief delivered to the battalion commander by PL prior to execution of the construction mission.

QUESTION 57

Roles- Project Supervisor

ANSWER

PSG o Enforce safety, hold soldiers to schedule, quality assurance o Manage Level III Gantt chart

QUESTION 58

Roles - Crew Leader

ANSWER

Squad Leader • On site, make sure things getting done, primary inspector • Assist PL in plan (BOM, quality control checks, timeline)

QUESTION 59

Roles - Safety NCO

ANSWER

• Not operating equipment, doing construction • Sole job is safety • Conduct daily safety briefs; maintain sign in sheet • Designate them with different color hard hat or PT belt

QUESTION 60

Roles - Materials NCO

ANSWER

• Full or part-time • Manage class 4 yard • Inspect incoming materials for damage and correct material

QUESTION 61

Roles - Construction engineer technician

ANSWER

Company or platoon 120A, warrant officer • Expert at company level to advise you on project • Quality control officer (Assist in quality control plan - PL writes it; Daily inspections)

QUESTION 62

Terms - Activity Estimate Worksheet

ANSWER

Planning tool for developing an estimate of material, manpower, equipment and time required to complete a specific activity within a logic network of construction tasks

QUESTION 63

Terms - BOM

ANSWER

Bill of Materials; Comprehensive list of materials, stock numbers, and prices required to complete the full scope of an assigned construction mission.

QUESTION 64

Terms - Construction Directive

ANSWER

Formal notification to initiate planning and execution of a construction mission; Generated at battalion level or higher

QUESTION 65

Terms - Construction Mission File

ANSWER

A complete historical record of a project from inception to completion

QUESTION 66

Terms - CWS

ANSWER

Construction work schedule; Chart that depicts the activities generated for the CPM (critical path method) in calendar form; shows early start/late start times and float

QUESTION 67

Terms - CPM

ANSWER

Critical Path Method; determining the longest path through the network diagram, the earliest and latest an activity can start, and the earliest and latest activities can be completed

QUESTION 68

Terms - Gantt Chart

ANSWER

Project management tool that depicts project activities, their assigned resources, start and end dates, durations, and interdependencies

QUESTION 69

Terms - Letter of Acceptance

ANSWER

Serves as official closure and completion of the project, stating that the constructing unit has met the requirements and expectations of the customer.

QUESTION 70

Terms - Logic Network

ANSWER

AKA network diagram; representation of project activities in an array of parallelograms with lines draw to show their interdependencies without a time scale; used to analyze critical paths in a CPM

QUESTION 71

Terms - PCC

ANSWER

Pre-Construction Conference; provides a final review of the project management plan; all stakeholders present; conducted 21 days prior to project start

QUESTION 72

Terms - IPR

ANSWER

In-Progress Review; Meeting held at regular and appropriate intervals to ensure stakeholders are up to speed on a project