navy 3m Flashcards
All 58 questions from the navy 3m answer key as a ready-made study set — flashcards with spaced repetition, plus a practice test. Free, no account, and your progress stays on your device.
Studying for this with your unit? Send it to them.
See every navy 3m answer on one page →
Studying saves this set to your sets, where you can export it as a file. Need the answers instead? Open the navy 3m answer key.
What's on the cards
- What is the goal of the Ship's 3-M System?
- What does the Navy call the nucleus for managing afloat equipment maintenance?
- OPNAVINST 4790.4G lists six things the 3M System must provide. Name them.
- In the 3M System, what does 'standardization' mean?
- In the 3M System, why are maintenance actions documented?
- Which current instruction sets Navy 3M System policy?
- Does OPNAVINST 4790.4G cover nuclear propulsion plants?
- What is PMS, according to 3M policy?
- What is the objective of PMS?
- PMS and another technical publication disagree. Which one prevails, and what should you do?
- Under what concept are PMS maintenance procedures developed?
- What is a Maintenance Index Page (MIP)?
- What does a Maintenance Requirement Card (MRC) provide?
- What does the List of Effective Pages (LOEP) list?
- On an MRC's control number, what do a final Y, N or U mean?
- What are the three categories of PMS periodicity?
- What do the PMS calendar periodicity codes D, W, M, Q, S and A stand for?
- What does a number in front of a periodicity code, such as 2D, 3W or 8M, mean?
- What does an asterisk (*) after a PMS periodicity code mean?
- What does a plus sign (+) after a PMS periodicity code mean?
- What do the non-calendar periodicity codes R, U and AP mean?
- What are the four inactive equipment maintenance (IEM) codes?
- Who determines whether equipment is in inactive equipment maintenance (IEM) status?
- A MIP has two monthly MRCs. How are they numbered?
- In SKED, what is the allowed date range for a quarterly check?
- What is a PMS situational requirement?
- When is an MRC considered complete?
- Before preliminary MIP requirements are scheduled, who must verify they apply to installed equipment?
- What is a PMS feedback report (FBR) used for?
- What is a Category A PMS feedback report?
- What is a Category B PMS feedback report?
- When is a technical PMS feedback report classed Urgent?
- When is a technical PMS feedback report classed Routine?
- When do PMS force revisions normally take effect?
- What must the 3-M Coordinator do with each Advance Change Notice (ACN)?
- What does the 3M System require all afloat activities to report?
- What is the purpose of the Current Ship's Maintenance Project (CSMP)?
- Who is responsible for making sure the CSMP accurately describes a work center's material condition?
- What classification of data may the CSMP contain?
- How many job actions can one work candidate (OPNAV 4790/2K) cover?
- Who must keep the Work Candidate/JSN Log?
- What job control number (JCN) goes on a material request that supports a maintenance action?
- What version of SKED satisfies the 3-M Manual's administrative rules for PMS scheduling?
- Why are SKED PMS schedules called dynamic?
- Under SKED true interval scheduling, how many days apart are weekly, monthly and quarterly checks?
- Can a supervisor manually reschedule a PMS check that is out of periodicity in SKED?
- When does SKED generate a PMS alert?
- Who performs the SKED weekly closeout?
- PMS was not done on time. Who enters the reason, and who reviews it?
- In SKED, who approves electronic MRC procedure line-outs?
- What does the SKED Periodic Accomplishment Rating (PAR) measure?
- How is the SKED Spot Check Accomplishment Rating (SCAR) calculated?
- What is a 3-M assist visit?
- What must every 3-M assist visit include before it ends?
- What is a TYCOM 3-M inspection?
- Who is responsible for a ship's own 3-M training program?
- Which publication holds the 3-M Personnel Qualification Standards?
- Who is the program manager for fleet-wide 3-M training?
Answers are on the backs of the cards — or open the full navy 3m answer key to read them all at once.